ILLINOIS VALLEY COMMUNITY HOSPITAL

3rd and 4th Floor Addition
Peru, Illinois

Project Description
Continuing a project that K&A designed several years ago, a new third and fourth floors will be placed on top of the existing 2nd floor operating rooms, approximately 16,000 square feet, consisting of new intensive care unit and a new labor delivering unit with c-section operating room, along with the remodeling of two existing operating rooms on 2nd floor.

HVAC
  • New 250 ton screw chiller and tower, 125 BHP steam boiler incorporated into existing plant.
  • Four new air handling units, three are dedicated to operating rooms, one for third floor.
  • New 30 ton air cooling chiller, delivering 38° F chilled water for all three operating rooms.


  • Plumbing, Medical Gases, & Fire Protection
  • Extending existing infrastructure from last addition up to support this project
  • Replacing gas fired tank and water heater with new steam feed insulated water heater for east facility


  • Electrical
  • Utilizing existing infrastructure from last addition, by K&A,. In anticipation for this project, K&A is extending current normal, emergency, critical and life safety systems for this project